Home / Solutions / Infrastructure
InfrastructureLinear projects, mapped end to end
Corridor mapping and condition documentation for roads, drainage, utilities and other long, hard-to-walk assets, with records you can compare over time.
Miles of work are hard to see from one place
Linear projects stretch past what a crew can walk and document in a day. Aerial capture covers the corridor in a single mission and returns a continuous, measurable map instead of a folder of disconnected photos.
Continuous corridor maps
Orthomosaics along the full alignment for progress, right-of-way and restoration records.
Condition documentation
High-resolution imagery of structures and assets without lifts, lane closures or crews on hazardous terrain.
A record over time
Repeat flights build a dated history for change tracking, claims and maintenance planning.
What an infrastructure engagement includes
Missions are planned around the alignment, airspace and access, with repeatable flight lines for later comparison.
- Corridor orthomosaic, continuous along the alignment
- Elevation models, for drainage and grade review
- Asset imagery, structures, crossings and outfalls documented in detail
- Pre- and post-construction records, for right-of-way and restoration
- Inspection report, findings by location and severity, reviewed before delivery
Common infrastructure applications
Roads and site access
Alignment progress, grading and paving documentation.
Drainage and canals
Channel condition, erosion and vegetation monitoring.
Utilities
Trenching, installations and restoration along the route.
Structures and roofs
Visual condition records for assets that are difficult to reach.
Scope, plan, capture, process, deliver
Scope
Outcome, site boundary, deliverables and schedule agreed with your team.
Plan
Airspace review, authorizations, flight plan and site safety briefing.
Capture
FAA Part 107 flight operations on repeatable flight paths.
Process
Maps, models and quantities produced, then reviewed.
Deliver
Exports and reports, typically within 48 hours.
What project teams ask first
Can you fly near roads and public areas?
Flights follow FAA Part 107 rules, including limits on operations over people and moving vehicles. We plan flight lines, timing and any required authorizations around those rules during scoping.
Do you provide engineering assessments?
No. We provide imagery, maps and documented observations. Engineering judgments belong to your licensed engineer, and our deliverables are built to support their review.
How long a corridor can you map?
It depends on the alignment, access points and airspace. Longer corridors are flown in segments and delivered as one continuous map.
Do you offer thermal imaging?
Sensor options are confirmed per project. Tell us what you need to detect and we will confirm what we can capture before quoting.
Scope your site with us
Tell us the acreage, phase and what you need to see or measure. We reply within 24 hours with a flight plan and quote.

