Home / Solutions / Commercial Construction
Commercial ConstructionEvery phase of the build, documented from above
Recurring aerial captures give general contractors, owners and lenders one current record of the job: what is built, what changed, and what is next.
The site changes daily. The record should keep up.
Site walks show one moment from one angle. Photos live on phones. When a dispute, a draw request or an owner meeting arrives, the team rebuilds the story from memory. Scheduled aerial capture replaces that with a dated, complete record.
Complete site documentation
A timestamped aerial record of the entire site on every capture, ready for owner meetings, disputes and insurance claims.
Progress you can show
Sequential captures and AI change detection summarize what moved between flights, so reviews start from the differences.
Reports that support draws
Dated progress documentation formatted for owner and lender review, delivered as a PDF or a share link.
What a monitoring engagement includes
A fixed capture schedule, repeatable flight paths and a consistent deliverable set, so week 30 compares cleanly with week 3.
- Scheduled captures, weekly, bi-weekly or at milestones
- Top-down map and obliques, from the same positions every flight
- AI progress and change analysis, on the Ceezaer platform
- Branded progress report, PDF and share link for stakeholders
- Safety and logistics visibility, access routes, laydown and site conditions
Tracked from site prep to punch list
Site prep and earthwork
Clearing, grading and utility installation documented with dated captures.
Foundation and structure
Footings, slab pours and structural erection recorded as they happen.
Envelope and roofing
Roofing, waterproofing and cladding coverage tracked across elevations.
Site work and closeout
Paving, landscaping and final conditions recorded for turnover.
Scope, plan, capture, process, deliver
Scope
Outcome, site boundary, deliverables and schedule agreed with your team.
Plan
Airspace review, authorizations, flight plan and site safety briefing.
Capture
FAA Part 107 flight operations on repeatable flight paths.
Process
Maps, models and quantities produced, then reviewed.
Deliver
Exports and reports, typically within 48 hours.
What project teams ask first
How often should a commercial site be captured?
Most projects benefit from weekly captures. High-pace phases such as structural erection may justify more frequent flights around critical milestones.
Can reports go directly to our owner or lender?
Yes. Reports are produced as branded PDFs and share links formatted for owner and lender progress reviews.
Does aerial monitoring replace site walks?
It complements them. Aerial capture adds the full-site perspective, historical comparison and consistent documentation that ground walks cannot provide.
Will flights disrupt work on site?
No. Flights are planned around site activity and crane operations, briefed with your superintendent, and kept short.
Related field notes
Drone construction progress reports for general contractors
Read the guide → Draw requestsHow aerial progress photos support draw requests
Read the guide → IntegrationBringing drone data into construction software
Read the guide →Scope your site with us
Tell us the acreage, phase and what you need to see or measure. We reply within 24 hours with a flight plan and quote.


