Skip to content
Veteran-Owned / FAA Part 107 / Round Rock, Texas
Top-down aerial map of a civil site with graded pads, pipe laydown, stockpiles and excavators

Home / Solutions / Civil Construction

Civil Construction

Measure the dirt before it costs you

Mapping flights turn a large, moving site into current surfaces and quantities: stockpile volumes, cut/fill, and a dated record of grading and underground work.

The problem

Earthwork disputes start with numbers nobody trusts

Load counts and manual shots leave gaps, and a site that moves thousands of yards a week is hard to verify from the ground. A mapped surface gives the contractor, the engineer and the owner the same quantities from the same data.

Quantities from the surface

Stockpile volumes and cut/fill quantities calculated from a mapped surface with a documented base.

Surfaces for every capture

Surface and terrain models and contours for drainage, grading review and comparison over time.

Utilities on the record

Trench and underground work captured before backfill, tied to a dated orthomosaic.

What you get

What a civil mapping engagement includes

Flights are planned for consistent overlap and ground sampling so that surfaces compare from one capture to the next.

  • Orthomosaic map, GeoTIFF and KMZ for CAD and GIS
  • Surface and terrain models, DSM and DTM with contours
  • Volumetric report, stockpiles, cut/fill and material estimates
  • Point cloud, LAS for surface comparison and modeling
  • Project report, flight parameters, accuracy notes and data specifications
Survey drone staged on a landing pad beside a canal before a mapping flight
Coverage

Where aerial data fits in civil work

01 / PHASE

Pre-construction

Existing conditions mapped before mobilization as the baseline surface.

02 / PHASE

Mass grading

Recurring surfaces show progress toward design grade and quantities moved.

03 / PHASE

Underground utilities

Trenching and installations documented before they are covered.

04 / PHASE

Paving and closeout

Final surfaces and site conditions recorded for turnover.

How it works

Scope, plan, capture, process, deliver

Scope

Outcome, site boundary, deliverables and schedule agreed with your team.

Plan

Airspace review, authorizations, flight plan and site safety briefing.

Capture

FAA Part 107 flight operations on repeatable flight paths.

Process

Maps, models and quantities produced, then reviewed.

Deliver

Exports and reports, typically within 48 hours.

Questions

What project teams ask first

Is a drone map a licensed land survey?

No. Ceezaer provides aerial mapping and quantities for planning, tracking and documentation. Boundary and legal survey work requires a Registered Professional Land Surveyor, and we can coordinate with yours, including flying to their ground control.

How are volumes calculated?

Imagery is processed into a surface model. Volumes are computed between that surface and a base: a prior capture, a defined plane, or a surface your engineer supplies. The report states which base was used.

How accurate are the quantities?

Accuracy depends on site conditions, ground control and flight parameters. Each project report documents the method and accuracy notes for that capture, and we scope control requirements with you before flying.

What formats do you deliver?

GeoTIFF, KMZ, OBJ, LAS and PDF reports, compatible with common CAD, GIS and earthwork software.

Get started

Scope your site with us

Tell us the acreage, phase and what you need to see or measure. We reply within 24 hours with a flight plan and quote.

Base
Round Rock, TX 78681
ScheduleBook a call
ResponseWithin 24 hours

Request received.

We will email you within 24 hours with a flight plan and quote.

Book a Call Now
FAA Part 107 Certified $1.5M Insured Reply within 24 hours